Our talented team of carpenters has been hard at work fitting a brand-new structural ceiling in the refurbished toilets at Holland Park. The project involved constructing a new timber structure, designed with precision to include openings for radiators. This robust framework was securely bolted into the walls and reinforced with masonry straps, ensuring maximum structural stability.
Thanks to the client’s positive feedback and trust in our work, we were subsequently commissioned to replace all the cast iron rainwater goods around the entire building perimeter.
A huge well done to the team for their dedication and excellent craftsmanship